Rail Engineer/Road Engineer/Quantity Surveyor/Estimator/Scheduler

謝礼金額の目安 直接アドバイザーにお問い合わせください

経験内容

  • 建設(ゼネコン)
  • 制作

Bachelor of Civil Engineering from Pune University, India, year 1998.
Worked in Countries Malaysia, UAE, Bahrain, Georgia and India.
Experience in writing review comments /Feedback on proposed amendments to the Manual of Uniform Traffic Control Devices (MUTCD) Part 3 for The Department of Transport and Main Roads (TMR), Queensland, Australia. 
Experience in Geometric design of High Speed Rail, Dedicated Fright Corridor of Rail Track, Mass Rapid Transition (MRT), Light Rapid Track (LRT), Road/Highway, and Airport.
12 years practiced in Geometric Alignment Design of High speed Rail,Roads/Highways, Railways (MRT/LRT/Metro/DFCC) and Airports Runways. This includes design checking, Review and approval.
 Worked as a contractor, Consultant and Client.
Worked 6 years as a Quantity Surveying, Estimation and Scheduling.
Good understanding of Australian Code Austroads,TMR, American Code ASSHTO, DMRB, Rail Code and Condition of Contract FIDIC/JCT.
7 years used Primavera P3/MS Projects
12 years used MX Road/MX Rail, Auto Cad.
Knowledge of 12 D/BRT(Bentley Rail Track)/Micro station Designer Software
Member of ASCE,RICS ,and Permanent way Institution NSW (Australia) and Charted Engineer, Institution of Engineers India,Member of IPWEA Queensland (IPWEAQ),M.IPWEA Australasia

この経験にスポットコンサル依頼をしませんか?

相談開始後、スポットコンサル実施確定まで費用はかかりません

登録して事前相談

スポットコンサル依頼時によくあるご質問

  • Q

    アドバイザーの回答の質や依頼に適した方かはどうやって判断すればいいですか?

  • A

    アドバイザーとのメッセージは無料です。気になる点は、謝礼を決済する前に直接アドバイザーにご確認ください。

  • Q

    支払いはいつ発生しますか?

  • A

    スポットコンサルを依頼することが決まった時点で、決済が必要になります。謝礼の決済をもって、スポットコンサルは正式に確認予約されます。

その他スポットコンサル時のFAQ

氏名:非公開

職歴:非公開


18 overall experiences in detailed design and management of Road/Highway, Rail, Airport Runway • 12 years practised in Rail Alignment Design of High-Speed Rail, MRT (Mass Rapid Transit),LRT (Light Rail Transition ),Metro and DFCC(Dedicated Fright Corridor. This includes detailed design, design checking, review and approval. • 12 years used MX Road/MX Rail, Auto Cad. Knowledge of 12 D/BRT(Bentley Rail Track)/Micro station Designer Software Brief description as a rail alignment design engineer : 160 km long Kuala Lumpur-Singapore High Speed Rail Project 200 km long East Coast Rail Link (Malaysia)Project 54 km long MRT line 2,Kuala Lumpur(Malaysia) Project 300 km long Iqbalgarh-Revari Dedicated Fright Corridor (India)Project Kolakatta(India) Metro Rail Project Saudi Arabia Rail Metro Parking Project Dubai Rail Metro Junction Improvement (UAE)Project 45 km long Ludhiana to Sanehwal Dedicated Fright Corridor Rail (India) Project Brief Description as a Road Alignment Design Engineer: 50km long 4 lanes of Jammu to Udhampur Highly Road (India) Project 154 km long 2 Lanes of Uttrakahnd Hilly Road (India) Project 205 km long 4 lanes of Aurgabad Yedeshi Maharstra State National Highway (India) Project 60 km long 2 lanes of Bihar State Highway (India) Project 105 km long four lane of Pune-Sholapur National Highway (India) Project 56 km long 2 lanes of Chindwara-Amarwara MP State National Highway (India) Project 35 km long 4 lanes of Jabalpur Ring Road MP State National Highway (India) Project Several 6 ,8 and10 lanes Dubai Highway (Dubai) Project 8 km long Amwaj Island (Bahrain)Project Word Bank funded 585 km long 2 lanes Karnataka State Highway (India)Project • Knowledge of DMRB and ASSHTO, British, Indian, Dubai and Malaysian Design Standards • 6 years experience in Estimation, Scheduling, and Quantity Surveying • 8 years used Primavera/MS Projects

プロフィール詳細を見る